our solution for

Mt Piper BESS Visualisations

BESS infrastructure bought to life in artist impressions

The challenge

The project team needed to visually demonstrate how the Mt Piper BESS proposed to utilise nearby, existing electricity infrastructure to develop a grid-scale battery with a capacity to dispatch up to 500 MW of power to the electricity network over a duration of up to four hours.

Our solution

Spatial Media created a series of artist impressions to support EnergyAustralia's community engagement efforts to connect and communicate. The high quality visuals overlay the technical engineering designs over drone base images captured at the existing power station site enabling them to show the future project in realistic, accurat context.

from our clients

C’est un réel plaisir de travailler avec leur équipe

Leur technologie de pointe nous a permis de mobiliser des parties prenantes de tous horizons autour de l’avenir des énergies renouvelables, grâce à une gamme complète d’outils d’engagement numérique : des visuels percutants et des vidéos explicatives, de la modélisation 3D interactive, des cartes personnalisées et des solutions web innovantes. C’est un réel plaisir de collaborer avec leur équipe et je recommande leurs services sans hésitation.
66
99
Andy Evans, Co-Fondateur, Star of the South