.jpg)
The project team needed to visually demonstrate how the Mt Piper BESS proposed to utilise nearby, existing electricity infrastructure to develop a grid-scale battery with a capacity to dispatch up to 500 MW of power to the electricity network over a duration of up to four hours.
Spatial Media created a series of artist impressions to support EnergyAustralia's community engagement efforts to connect and communicate. The high quality visuals overlay the technical engineering designs over drone base images captured at the existing power station site enabling them to show the future project in realistic, accurat context.