our solution for

Hawkes Bay Coastal Strategy Sliders

A long-term 100 year strategy for managing coastal hazards between Clifton and Tangoio is being developed through a Joint Committee made up of representatives of Hawke’s Bay Regional Council, Hastings District Council, Napier City Council and Iwi.

The challenge

Develop photo realistic visualisations to be included in the written strategy document that best demonstrate the proposed risk mitigation measures along the coastline.

Our solution

Spatial Media captured drone imagery along the coastline between Clifton and Tangoio and developed a series of 3D image renders that accurately depicted the concept design elements including groynes, gravel nourishment, sand nourishment and gravel barrier construction in context. The images vary in location to show how the strategy considers different approaches depending on the individual location.  The current view and proposed views were showcased individually in the extensively detailed Clifton to Tangoio Coastal Hazards Strategy 2120 document that is under development. The document contains a lot of complex information 50+pages and outlines a number of different options.

from our clients

They look tremendous, the team have done amazing work!

Our booth was very popular - the imagery and corflute poster was so incredible to point at our ideas, even at a concept level. Well done to the the Spatial Media team!
66
99
Rainer Knobloch, Co-Founder - Strategy and Operations